-  Change the number of observing nights (in red) for an approximate scaling.  
-  The estimate is reasonable for 3 < nights < 15.  
-  Costs are subject to change. 
-  Final costs will depend on instrument and cryogen delivery schedules. 
-  Assumes a Sharc II cycle every night. 
-  The heterodyne instruments include 5 l /day of LN2 for tuning and calibration. 
-  The sidecab receivers are combined. 
-  For the sidecab and 850  GHz-  receivers, 60 l LHe dewars are used. 
-  For the other instruments, 100 l LHe dewars are used. 
-  LHe dewar quantization is only approximate. 
-  LHe boiloff from the delivery dewars is ignored. 
-  For the LHe dewars, rental days = observing nights + 2. 
-  Staggered deliveries of LHe are ignored.